Page content loading animation GIF

COLORADO STATE UNIVERSITY

CHEMISTRY BUILDING

Location: Fort Collins, CO

Completed: 2017

Project Type: Laboratory

Products: Venturi Valves,Water Coils,Laboratory Room Controls,Fume Hood Controls

Project Size: 60,000 ft²

Construction Cost: $41 million

Engineer: Cator Ruma & Associates

Representative: CFM Company

AUGUSTANA UNIVERSITY

FROILAND SCIENCE COMPLEX

Location: Sioux Falls, SD

Completed: 2016

Project Type: Laboratory

Products: Venturi Valves,Water Coils,Laboratory Room Controls,Fume Hood Controls

Project Size: 125,000 ft²

Construction Cost: $35 million

Engineer: TSP Inc. and Smith Group

Representative: Climate Systems

DENVER UNIVERSITY

FELIX RITCHIE SCHOOL OF ENGINEERING AND COMPUTER SCIENCE

Location: Denver, CO

Completed: 2016

Project Type: Laboratory

Products: Venturi Valves,Water Coils,Laboratory Room Controls,Fume Hood Controls

Project Size: 130,000 ft²

Construction Cost: $65 million

Engineer: Schaffer, Baucom, Engineering & Consulting

Representative: CFM Company

MICHIGAN STATE POLICE

METROPOLITAN DETROIT FORENSICS SCIENCE LABORATORY

Location: Detroit, MI

Completed: 2014

Project Type: Laboratory

Products: Venturi Valves,Water Coils,Laboratory Room Controls,Fume Hood Controls

Project Size: 51,000 ft²

Construction Cost: $9.4 million

Engineer: SmithGroupJJR

Representative: Michigan Air Products

UNIVERSITY OF COLORADO

ANSCHUTZ MEDICAL CAMPUS BIOSCIENCE 2 BUILDING

Location: Denver, CO

Completed: 2015

Project Type: Laboratory

Products: Venturi Valves,Water Coils,Laboratory Room Controls,Fume Hood Controls

Project Size: 112,000 ft²

Construction Cost: $38 million

Engineer: M-E Engineers, Inc.

Representative: CFM Company